Siapro double regulated vertical Kaplan hydro power plant, automation and protection regulations, asynchronous generator 160 kW, installation in Europe, hydro power price is set individually


System SCADA
Head 2,3m
Flow 7,5m3/s
VIDEO

The river is actually flowing slow as the river-bed is relatively wide. Necessary flow dynamics are ensured by the proper intake design. New Siapro Kaplan hydro-electricity power plant under construction in a new wooden machine house, wooden house is local district law. The price of the Kaplan hydroelectric power plant is determined for each project separately, as it is an individual designed project and realization made "turnkey".

SIAPRO d.o.o.
Постая, 9
5216, Мост на Сочи
Словения, Европа

Тел: +386 5 3841 632
E: hydro@siapro.si
W: www.siapro.eu

Персональные контакты >

Подписывайтесь на нас

      


 

Референции

Гидроэлектростанция в Сербии
Гидроэлектростанция Жага
Гидроэлектростанция Церкница
Гидроэлектростанция в Африке
Гидроэлектростанция Ерала
Гидроэлектростанция Кавчич
Гидроэлектростанция Гобовщица
Гидроэлектростанция Гобовщица
Гидроэлектростанция Когой
Гидроэлектростанция в Сербии